photo de profil d'un membre

Bertrand Chazelle

Résumé

 Generalist Engineer with 19 years of experience in the Energy industry including proven past experience in offshore and onshore projects, and in energy transition design and business developments.
 Strong experience on large EPC LNG project, including FEED, detailed design, procurement engineering, construction, commisioning and start-up, contract and negotiation with major EPC Contractors.
 Strong team leader with acknowledged Project Management skills, able to take or propose to his manager proper actions and decisions to respect targets.
 Good communication and managerial skills, capabilities to take workload, able to work in a multicultural environment.
 Very familiar with engineering and project management practices, procedures and organisation.
 Fluent in English and able to adapt in countries with different languages.

Expériences professionnelles

Architecte

TotalEnergies , Le havre

De Septembre 2018 à Aujourd'hui

Réalisation d'études de prospects et d'avant projets pour le développement des futurs projets industriels de la Compagnie:
- Usines pétrochimiques
- Usine de fabrication d'hydrogène vert
- Capture de CO2
- Bio-carburants

Project area manager utilities, offsites, jetty on yamal lng project

Yamal LNG , Moscow

De Septembre 2015 à Août 2018

Project Area Manager Utilities, Offsites and Jetty - Russia – 09/2015 to date
• Project management of the LNG Plant Area including the Utilities (power generation, Air and Nitrogen systems, water/glycol and hot oil heating systems, fuel gas system), offsites (drainage and flare systems, Boil-off gas compression, LNG and condensates offloading), Jetty and administrative areas. (Package value > 8 billion USD)
• Direct reporting to the LNG Plant Project Director
• EPSCC Contractor management focal point for all activities related to the Area
• Transverse coordination of activities with the engineers and personnel from planning, engineering, procurement, contract, logistics, construction, commissioning and operations departments.
Key achievements:
- LNG Production started on schedule and on budget, with Utilities and offsites in good operation.
- No dispute or claim pending with main EPC contractor

Parcours officiels

Ecole Centrale Paris – Ingénieur – Mécanique, Aéronautique, Energie – 2002

Langues

Russe - Notions

Anglais - Courant

Espagnol - Technique

Compétences

Construction de chaudière ou centrale autre
Construction navale
Energie pétrole
Carburants
Matériaux composites
LNG
EPSCC
Projets complexes
international project management
Oil & Gas
FEED
Detailed Engineering
Construction and Commissioning
Energie
Hydrogène et Energies renouvelables

Centres d'intérêt

  • Energies renouvelables
  • Environnement escrime
  • musique
  • tennis
  • voile